Pool Before Demo & Remodel Started
Before
Here is a project we just finished after 7 weeks in Sacramento, CA it consists of removing the pool decking surrounding the swimming pool, striping the existing pool plaster, removal of the pool tile. This customer wanted to add a few water features we added 3 water sheer Decents to the raised walls and 2 deck jets to the pool. We also added color LED lights and a heat pump so they can extend the pool swim season.
Strip Out is not blasting, as blasting is not stripping. Blasting can rough up the old plaster & remove loose plaster, but does not allow for what is under the old plaster, such as hollows, gunite issues, etc. A complete strip out is best for delamination problems, soft chemically absorbed plaster, etc Sac Pool Pros will not take any short cuts when re-plastering your swimming pool.
Finished Product this customer went with our mini pebble pool finish!
Pool Plastering, Pool Remodels, Sacramento Pool Plastering, Swimming Pool Re-Surfacing, Sacramento Plastering, Pool Re-Surfacing Sacramento